Monday: walk, book group, meeting
Aug. 12th, 2024 11:00 pmI walked with M.
No school, so A. slept in.
R. drove out to Florence. I attended the meeting remotely.
I’ve been going over the estimate repeatedly, trying to understand everything there. J. figured out that Door 1 was in the Marvin section, even tho that was never correct. I _think_ that today I discovered that there is nothing in the estimate about countertops, other than that they are not included in the millwork part of the estimate. Welp. So I got into Procore, used the area tool to estimate the size of the relevant countertops and then multiplied that by a number. I have no idea what should go into that estimate in terms of labor, however.
No school, so A. slept in.
R. drove out to Florence. I attended the meeting remotely.
I’ve been going over the estimate repeatedly, trying to understand everything there. J. figured out that Door 1 was in the Marvin section, even tho that was never correct. I _think_ that today I discovered that there is nothing in the estimate about countertops, other than that they are not included in the millwork part of the estimate. Welp. So I got into Procore, used the area tool to estimate the size of the relevant countertops and then multiplied that by a number. I have no idea what should go into that estimate in terms of labor, however.